|
Forums36
Topics42,112
Posts571,656
Members19,114
| |
Most Online13,012 Jun 7th, 2026
|
|
|
1 members (Dave Davidson1),
2,086
guests, and
44
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Aug 2025
Posts: 3
|
|
Joined: Aug 2025
Posts: 3 |
So I've decided to use Western Liner to provide a 40mil RPE liner. I just don't want to worry about leaks so that is the direction I've gone.
That said, I'd like to create the best fish habitat I can so should I line the bottom with soil and work from there. In a previous thread I've asked if anyone has had success retaining soil on the 3:1 slope on the sides of the lake/pond. Whether or not that is possible, I certainly can line the flat bottom with soil to promote habitat but I'm a noice and need advise.
|
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
The liners in other than production ponds are supposed to be covered with 12" soil from bottom to top. You start at the top, do NOT drive on an uncovered liner, and work your way to the bottom. Yes to the 3:1, a customer had a pond dug last year like that. The soil protects the liner from the cover that you will be placing in the pond, and gives plants a place to root.
Make sure the bottom of the pond is rock/stick free before rolling out the liner. Can you get a 1 piece liner or one that is pieced at the factory or do you have to seam pieces together on-site? How much will the liner weigh, and will you need equipment to move it around?
If the soil cannot be cleared of rocks, some companies have a liner pad that goes down first to protect the liner from getting poked from the bottom.
|
|
|
|
|
Joined: Aug 2025
Posts: 3
|
|
Joined: Aug 2025
Posts: 3 |
Thanks, that is very helpful...
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|