Hi all,
I'm new here and am hoping someone can point me in the right direction. I am managing a pond that has a spillway design for lowering or increasing the water level in order to manage a wetland below the dam. Unfortunately there are currently no stop logs and due to the design I am stumped on what material I need to use for the stop logs . The channel the stop logs slide down on each side is tapered (3 1/4" thick on the outside and 3 5/8" on the inside) The entire structure is 5' tall and 32 1/2 inches accross. I was not expecting a tapered design and really don't know what material I need to use to properly dam up the structure and ensure I can easily get the stop logs in and out. Any help would be appreciated.
Thanks!
Aaron