Here’s the actual verbiage from proposal listing scope of work:
Pond Project
- installation of pond roughly 3/4 of an acre big and
averaging minimum 12’ deep
- overflow to be cut in on virgin ground to existing
ditch below pond, lined for 30’ with road fabric and rip rap to prevent any erosion
- all disturbed ground will be graded with topsoil, conditioned with soil preparator, seeded and covered with straw
- cut in two swales from new sluice pipe installation entering driveway to shed and one swale from wet spot behind shed building draining down to pond
- install 12” sluice pipe 20 feet long to drain ditch from roadway under new driveway installation
- remove topsoil from roadway 140’x15’ wide to front of shed along with 50’x50’ pad to right of shed for parking and future buildings
- spread gravel on entire stripped area and vibratory compact
- any disturbed grass areas around new gravel installation to be seeded and straw spread