My damn will actually be the last stop water can go before running into the lake of the Ozarks. So I will be collecting all the water I can from the watershed/runoff. But a 5hp 50gpm well will do 2 million gallons a month. Hopefully the drought is over but I will miss any spring rains. Probably be summer before construction is done.
Oh LMB for the pond as well, I added that to my post since I forgot.
Last edited by R0b; 11/28/23 12:44 PM.