Finally had pea gravel put in on the spawning structure ledge yesterday morning. I had never seen the sling truck in action before, very interesting. Ended up with 9"-12" deep over most of it, after it settles and water gets over it should be just right for fish spawning. Will add some SM spawning structure on it.
Also shot 2" of pea gravel over the beach are as a base, will be putting 4"-6" of sand over it after it settles in and the water starts to get on it.
![[Linked Image from i.imgur.com]](https://i.imgur.com/zXJovZh.jpg)
![[Linked Image from i.imgur.com]](https://i.imgur.com/lNFfUVD.jpg)
![[Linked Image from i.imgur.com]](https://i.imgur.com/eNw9hvS.jpg)