Thanks guys! The berm should be at least 5-6' below the surface of the water. I would guess by early summer the water level should be above where I will place the berm at now. However, a drought could certainly impact that and re-expose the berm. I am concerned about the potential erosion with a dirt berm while the lake is filling. I found our local quarry is actually open so I could get a tri-axle load of rip-rap or #1's delivered and then use a bobcat to place them 12" high at the toe of the beach. That seems like it would stand up the best to the possibility of having the berm wash out. Anything else I may not have considered? I'm planning to start this either tomorrow evening or the following day!