The two pre fab steps are done and waiting to be delivered, I just need to prep it by digging in the solid block footers and spread sacked pea gravel over it all to keep steps from settling much. Problem is the frozen rock hard ground right now...I might try and spud/chip enough out to get everything set for the steps. The steps are concrete 8' long 8" high, one is 26" wide the other 12".


[Linked Image from i.imgur.com]