|
|
|
Forums36
Topics42,113
Posts571,671
Members19,115
| |
Most Online13,012 Jun 7th, 2026
|
|
|
|
Joined: Jun 2002
Posts: 417
Lunker
|
|
Lunker
Joined: Jun 2002
Posts: 417 |
I am still building a pond. It will have an "L" shaped dam and I have completed most of the side. I built part of it (we are using a layer of clay/gravel as caliche so I'm doing parts at a time). The part that I built had good clay and was moist enough to pack good. I started the bottom of the "L" before Thanksgiving and it was clay marbled with a white sand. It was a little dry and packed but didn't pack as good as the first. I decided to wait for a rain to finish but am tired of waiting. (If we get a big rain I will have 5 or 6 feet of water in my way) What happens if you use dry soils for the dam? I am guessing that it will take longer to set and sag more and I'm okay with that. I can fix it later. Will the dam eventually set and seal like a good boy or will it always leak more?
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|