|
|
|
Forums36
Topics42,113
Posts571,671
Members19,115
| |
Most Online13,012 Jun 7th, 2026
|
|
|
0 members (),
7,242
guests, and
126
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Dec 2005
Posts: 7
Junior Member
|
|
Junior Member
Joined: Dec 2005
Posts: 7 |
I have a small draw that runs through my farm. There is also an old abandoned highway that runs through my farm as well. I was thinking about dozing up this limestone base and building a damn across this draw that is basically 12' deep and 25' across. I would locate the damn on the downstream side of an existing pond that I am also planning on cleaning out at the same time. Would this limestone road base be OK to use if I compacted it every foot or so as I built the damn up?
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|