Buddy was doing some ditching and had some leftover 6" tile so I cut it into 4' long pieces and wired it to some of the structure we had that wasn't under water yet. Should work for CC hidey holes and spawning, also will be shooting some pea gravel onto the ledge and will put the rest of the load where it slopes down fast from beach.

[Linked Image from i.imgur.com]