Ok cool so I guess it’s no big deal? I’m assuming he will pile the clay up separately and then pack it back in when the pipes are ran. I know the ditch is going to have to be about 3 ft deep so I’m assuming we will be completely through the lining at that point. I’ll get more details on his part beforehand and he’s also ran pond loops before. Was just nervous about the process. Thanks