Quote:
Originally posted by Bob Koerber:
Mine is solid but I used 4 inch pvc sewer pipe for the pilings put in rebar and then filled with concrete. Very sturdy but we only get an inch or 2 of ice here.

Bob
Bob,

What exactly do you mean put in rebarb? I know what rebarb is and I think I know what you mean but could you elaborate? Do you drive the rebar into the pond bottom with the pond empty, slide the 4 inch pipe over it and then pour in the concrete?


If pigs could fly bacon would be harder to come by and there would be a lot of damaged trees.