I saw the contractor dig the core with a trackhoe and dozer, then pack soil with a sheepsfoot roller. I have no way to know if it was done correctly. I do know one area that is leaking through the dam, about 5 - 6 feet down from the top. My guess is this area wasn't compacted or there was sand in the soil.