Hillbilly, it has continued to fall at a rate of 6 inches a day. I'm hoping it will stabilize soon above the the one acre at the floor which held water in the bottom and I'll be able to find a hole. I've been going out daily and marking, to attempt to discover the point at which it stabilizes. It is within 2 feet of the original waterline or one acre floor which held, which means, it should stabilize within the next 4 days, roughly, assuming, of course, the extra weight did not blow something out at the very bottom of the one acre.
It has 8' of pretty decent dirt at the floor, so it shouldn't blow, but knowing my luck, who knows?
Thanks for asking!!!!!!
