Thanks, Quarter. In my case the standpipe is on dry land behind the dam, so electrical concerns probably wouldn't be too bad. On the other hand, may need a cherry picker to get 20 plus feet up in the air.

I like your idea of using a rubber system with clamps that could be taken off easily if necessary. If emergency spillway is a problem with higher water level, sure would be easier than cutting off what was welded on!


7ac 2015 CNBG RES FHM 2016 TP FLMB 2017 NLMB GSH L 2018 TP & 70 HSB PK 2019 TP RBT 2020 TFS TP 25 HSB 250 F1,L,RBT -206 2021 TFS TP GSH L,-312 2022 GSH TP CR TFS RBT -234, 2023 BG TP TFS NLMB, -160