I am planning on running a little 1/3HP motor with a Gast 0740 this winter. Should be making ~5.5 CFM at 2 PSI. Sooo, I could do 3 spots with dual vertex stations or maybe 5 single stations?

That leads me to an additional question. 3 duals or 5 singles and spread out or together.

Last edited by wbuffetjr; 08/22/17 07:22 AM.

Keep This Forum Viable, Read Pond Boss Magazine -
America's Journal of Pond Management