I used a post hole digger prior to the pond filling. I plan to put a "T" on the end of the dock this summer and will use a ladder to get some height and then drive them in with a sledge and a piece of wood to protect the end of the pvc. After I get the framing done will pump the pipes out and drive my rebar in and fill with concrete.

Bob