|
|
|
Forums36
Topics42,113
Posts571,660
Members19,114
| |
Most Online13,012 Jun 7th, 2026
|
|
|
2 members (Bill Cody, LeighAnn),
1,119
guests, and
91
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Apr 2002
Posts: 470
Member
|
|
Member
Joined: Apr 2002
Posts: 470 |
I used a post hole digger prior to the pond filling. I plan to put a "T" on the end of the dock this summer and will use a ladder to get some height and then drive them in with a sledge and a piece of wood to protect the end of the pvc. After I get the framing done will pump the pipes out and drive my rebar in and fill with concrete.
Bob
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|