Thanks for the feedback.

I read, on here I think, that to attract bass it is best to have the structure laid down. Crappie like the vertical stuff. Kind of makes sense in my experience bass love tree lay downs. My plan was to fill both ends with concrete and place in my pond. Probably two 10' sections running from deep to shallow water. I would like to make 30 pieces so whatever I do it needs to be easy.

I am leaning toward the aluminum wire to hold them in place. I may try the heat method to squeeze the pipe into the bigger pipe. Maybe just scrap the whole thing and buy the Porcupine balls.

Attached is a picture of the pond
Attachments
IMG_3754B.jpg