Once I get the easement from him, I plan on putting a secondary road in a little past half way up the lake. Basically a road through the lake. At on point a ill put in a bridge that will only allow a small boat to pass. This will give us a secondary access to our house, plus keep him from accessing the big end of the lake were sking could happen, but it wont stop me from getting into the north end of the lake with my mini pontoon boat.
I'm looking for one of the old military bridges.

Ive decided to put things on hold any way to let things calm down. The local timber company has said that if can give them a year to get the timber out that he can give me a far better price. That kinda works out perfect considering the all the bs I just ran into.