Forums36
Topics41,109
Posts559,619
Members18,588
|
Most Online3,612 Jan 10th, 2023
|
|
8 members (LANGSTER, Fishingadventure, SSJSayajin, FishinRod, Sunil, Tinylake, Boondoggle, WiPondGuy),
1,117
guests, and
226
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Jan 2009
Posts: 28,725 Likes: 896
Moderator Ambassador Field Correspondent ![](images/stars.gif) Lunker
|
Moderator Ambassador Field Correspondent ![](images/stars.gif) Lunker
Joined: Jan 2009
Posts: 28,725 Likes: 896 |
Welcome to the forum. If the concrete dam would utilize the natural rocks at each side, I would drill and epoxy rebar into those rocks and use a bonding agent on those rocks right before the concrete was coming out of the chute, and any other place where the concrete will be touching natural rock. You don't want the water finding a way around the concrete between the rocks and washing out a hole over time.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
There are no members with birthdays on this day. |
|
|
|