Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
fiksegts2, Kirk78, Rgv, Kalispel, TokyoTim
19,114 Registered Users
Forum Statistics
Forums36
Topics42,113
Posts571,672
Members19,115
Most Online13,561
Top Posters
esshup 29,788
ewest 22,033
Cecil Baird1 20,043
Bill Cody 15,996
Who's Online Now
2 members (jludwig, 10x), 6,393 guests, and 120 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
#438 03/24/04 11:06 AM
Joined: May 2003
Posts: 219
S
Lunker
Lunker
S Offline
Joined: May 2003
Posts: 219
I'm in the process of having a dam constructed
across a creek that traverses my property, and
I have concern about the large watershed that
feeds the creek. I applied for cost share under
EQIP for the last 3 years, but finally decided
to proceed without gov't finacial help. NRCS
has viewed the project area a number of times
with promises of help in the design of the project (should I proceed on my own). However,
they never provided me with any help at all,
even after repeated requests. Finally, they
told me they'd come out and stake off the dam
after area clearing was completed. Sill, no
specs were provided.
The dozer people, who have worked with NRCS on
gov't projects in the past, came out last week
and cleared the area. ( I have waited 5 months
for them because they are the best in the area).
However, NRCS has informed them at this late date that they will not assist in the project
because of the extensive watershed for the area.
After almost 3 years of familiarity with the
project and no red flags, I get this late breaking news (and second hand at that).
After such long waiting on the dozer people,
and the expense already incurred,
I decided to proceed on my own. We spent most
of yesterday re-shooting the elevatons back
to a county road (1600' upstream) and staking
out the dam. The dam will be about 600' long
over the creek area where it narrows to about
45' with 3:1 slopes, 12' crown, 4' freeboard,
and dual emergency OV areas 1' above a 12"
siphon pipe. The soil has a high concentration
of clay with some silting in the creek bank area.
The creek bed areas have some limestone areas
but probably will not be reached at the dam area.
I will use rip rap rock in the OV areas with good drainage on both sides of the dam.
Even though the drainage area for this creek is
large, I've yet to see much water flow in it,
even after heavy rains. See photo at link below.
I contacted NRCS this morning, and was informed
that the project was feasible, but, they'd
have to design it before they could participate
in any way. I understand this, but do not understad their
unprofessional and irresponsible behavior. Does anyone have similar experience
with such a creek dam project ? Sorry this was
long, but I'm overly disturbed about this
situation. Note, the dam area will be in the
upper area of the photo.


#439 03/30/04 11:17 PM
Joined: May 2003
Posts: 219
S
Lunker
Lunker
S Offline
Joined: May 2003
Posts: 219
I'm located in NE Texas.
Not sure of the eventual lake size but it will
extend about 1600' from the county road. The
creek has a serpentine shape, so the lake
should be around 2000' long. The dam work has progressed well and is nearing completion.
See below



#440 03/31/04 07:44 AM
Joined: May 2003
Posts: 219
S
Lunker
Lunker
S Offline
Joined: May 2003
Posts: 219
I don't have the final tally on cost, but the
dozer people get $85/hr for each machine.
They usually charge by the cubic yard ($1.00) and
use NRCS's total yardage estimates, but since
we could not get NRCS cooperation, the hour
rate was used. The dam pipe cost $1000 plus
installation. I have not even estimated lake size, but it will not be very large. The dam
area should have 3 to 4 acres of water and the
creek body may contain another 4 or so acres.
The size could easily have been tripled had the
county road constraint not been an issue.

#441 03/31/04 10:08 AM
Joined: Oct 2003
Posts: 764
N
Lunker
Lunker
N Offline
Joined: Oct 2003
Posts: 764
Great pictures, congratulations! Tell us what you plan to do with bottom structure. Making ridges, channels, islands etc. at this stage is sure a lot easier than tires, trees in concrete etc. later on.


Norm Kopecky

Link Copied to Clipboard
Today's Birthdays
DJT, JoeB, ponddamguy
Recent Posts
Feeders - I know - asked many times
by 10x - 09/18/26 06:51 AM
Iron Ore Well Water
by FishinRod - 09/17/26 10:21 AM
Stop Feeding- Will Bass Return to Foraging ?
by Theo Gallus - 09/17/26 09:46 AM
Gravel Pit Lake - Aeration ?
by WindowRock - 09/15/26 09:49 AM
Field and Stream Feeds?
by Bill Cody - 09/14/26 07:37 PM
Newbie from Colorado
by ewest - 09/14/26 03:34 PM
New Pond Update...
by ewest - 09/14/26 03:27 PM
Too much forage?
by Jst4Fun - 09/14/26 01:09 PM
Lotus variety of nice color
by gehajake - 09/13/26 02:07 PM
Billboard Tarp Pond
by jason7858 - 09/11/26 05:21 PM
LMB in 1 ac pond
by Terry Battisti - 09/11/26 04:10 PM
Previous lurker from Dayton, Ohio!
by ewest - 09/10/26 10:03 AM
Newly Uploaded Images
Uninvited crappie pictures
Uninvited crappie pictures
by fishwife, June 16
Chestnuts this afternoon
Chestnuts this afternoon
by Rangersedge, May 21
Trackhoe
Trackhoe
by Rangersedge, January 24
Thanksgiving RES
Thanksgiving RES
by Shorty, November 27
Nice 12 Inch BGxRES
Nice 12 Inch BGxRES
by Theo Gallus, June 1
F1 Bass stocked 6/24 caught 3/30/25
F1 Bass stocked 6/24 caught 3/30/25
by lafarmpondguy, March 31