|
|
|
Forums36
Topics42,115
Posts571,703
Members19,116
| |
Most Online45,564 Yesterday at 03:05 AM
|
|
|
|
Joined: May 2002
Posts: 39
Member
|
|
Member
Joined: May 2002
Posts: 39 |
I am getting close to raising the lake to full pool, but before I do, I want to create some spawning beds.
I have a roadbed that will be sumbmerged about 3ft below the surface. Is this feasable for spawning?
The bank edges transition to a 5 ft minimum through-out the whole 1 1/2 acre pond.
I was planning on putting about a 20' x 10' 4" layer of pea gravel on top of the road bed with some cinder blocks to hold the pea gravel in place. Should it be continuous or should I make 3 or 4 smaller beds?
Does this sound good or should I change my depths?
Will the bass also use these beds?
Wesley Dallas, GA
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|