I just finished construction of my pond and dam and have at least 30-40 truck loads of topsoil leftover. The pond location is pretty much solid clay as far down as we dig... We are spreading the soil back on the banks and dam of course but is it helpful enough to justify using to soil to have a layer in the pond itself on top of the compressed clay?