Figured I owed you guys an update. All the rain really pushed back the work on this but here is where I am at now. When we started digging it was pretty much just a huge bowl of clay. Once they build the (4:1) slope away from the pond up the drivable flat area on the dam should be at least twice the current width I think. I'm pretty pleased so far with everything but I'll feel better when I see some water in there.

Pic:

Last edited by dyrne; 08/15/15 09:40 AM.