Guys,
New post to an old thread....History...The new patio cracked like crazy so I had the guy tear it out and replace it. I told him he could save the expense of hauling away the broken concrete if he broke it up into small enough pieces for me to handle. So, of course, I have a big pile of these 2 x 2 or 3 foot chunks of concrete I can't begin to lift.
Question: My buddy can move the chunks with his bobcat or backhoe so that can be worked. I need to construct 2 swales into the pond. Will these chunks be a good option on top of mats for erosion control (maybe covered with smaller stuff) or should I use them in the pond as structure piles and/or to stabilze areas of the steeper shoreline? Or, does anybody have another idea on how to use them?
Last edited by Bill D.; 05/30/15 07:10 AM.