I think snrub hit it on the head. I raised mine 6" over design looking at all the factors snrub laid out and also held a short on-site meeting with my dirt guy and SWCD contact. I think the 2 most important points to consider is dam width and emergency spillway size.

Don't know if it is possible but you could always remove the block before a large storm or you are hitting capacity.