Originally Posted By: snrub
I think it is a cool idea.

You ask to pick your idea apart, and the only big downfall I see has to do with the ongoing cost of operation. As long as you are good with supplying the inputs to keep the artificial water flowing to keep the ponds in good shape it looks like it should work keen.

I don't see where you would need to wait two years to make the ponds, as long as you compacted the soil properly as it was deposited onto the plateau.

Besides, we don't want to wait two years to see how it works out! grin I can be really good at spending other peoples money. Get right on the project! laugh


Thanks Snrub,

I would love to push forward faster and will if I can. I remember when we dug the pond we have now that once you get down about 2 or 3 feet you hit water. Even though we kept the hole pumped down during digging, the dirt, gravel, sand and stone mix was super saturated with water and flowed when they dumped the bucket - kind of like wet concrete flows. Not sure how I can pack that kind of stuff in layers as I build the plateau. I am thinking, right or wrong, that I want that plateau as stable as possible before building the micros, especially if I go with a liquid sealant as Bill C. suggests. I would think much shifting of the plateau settling would cause leaks in that scenario. The good news is, I used several hundred truck loads of the stuff from the pond for fill around the new house and it dried out nicely and seems to make great fill, very little settling observed so far.


[Linked Image]
Be Brave Enough to Suck at Something New!