I have done this little trick of cecil's and it does work pretty well. I used 4 foot long 3/8th inch rebar. I put them about 20 or so feet apart. Pounded them in 12 iches that left me 3 feet. I then put a line at 10 inches and one at the top. I just rapped the line around the rebar a couple of times and kept going. Worked pretty well except I think I had some deer get into it on the far side of the pond as the line seems to be broke and there are deer tracks all around. The GBH does not land by my feeder anymore though. I think I pissed him off enough that he is tired of trying!! I have not seen him in a good while. Or someone else took care of him if you know what I mean.....
RC
P.S. The only con to this idea is as your pond dries up the GBH could land on the front side of where you originally put your line. Just because you set your line at the edge of the water doesn't mean in 2 months that where the edge of your water is going to be! Just keep that in mind...
Last edited by RC51; 08/15/14 01:49 PM.