Well, the boss and I went and dropped off the 6" PVC pipe for the drain. This will be the first visit since phase II kicked in this past week. The building site is cleared, along with a .22 ac. south-facing picnic/beach area. This along with clearing out an emergency spillway, cutting in more driveway, clearing more pond perimeter in preparation for the peripheral driveway, and other various diggin' and prunin'....Ka-ching! Anyway, I wanted to share a pic taken right from the spot within the "yellow" building site where a home will someday reside. This is the zone that will eventually be filled in with basin soil, creating a short, wide peninsula projecting directly out/away, reaching out side-to-side.
For reference, the white "patch" at the far end is 300 ft of 20' sections of 6" PVC pipe. The truck and 16' utility trailer are parked to the right of the PVC pile, directly in the center of the damsite.
...don't mean to bore ya'll...just kinda buzzed on the progress. I'm still stuck on the septic field thing \:\(