The fabrication shop caught up on other work now that I have until Fall. Finally getting it close to completed. Catwalks have ant-slip surfaces now. DOT Saftety bumper built. The "tube rack" is closed in, lighted, and ready for it's door. Lighting wired and installed, lower profile tires back on the lift axle for more ground clearance when raised. Tanks are on, hold down straps being fitted and installed...Once the Fab shop finishes, I hope to find some underwater graphics scenes to put on the sides of the tanks and then I get to install all the electronics....