|
|
|
Forums36
Topics42,113
Posts571,680
Members19,115
| |
Most Online23,413 9 hours ago
|
|
|
1 members (Theo Gallus),
15,475
guests, and
266
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jun 2014
Posts: 32
|
|
Joined: Jun 2014
Posts: 32 |
2.5 acre 28ft deep. halfway full now so no rush. Someone told me a 2 foot culvert would do the trick with class A rock on the back for erosion control. Any input greatly appreciated. Do I need a face wall on the pipe or just the pipe itself?
|
|
|
|
|
Joined: Feb 2006
Posts: 1,960 Likes: 20
Moderator Lunker
|
|
Moderator Lunker
Joined: Feb 2006
Posts: 1,960 Likes: 20 |
Will the pipe be the primary or emergency spillway? How big is your watershed?
|
|
|
|
|
Joined: Jun 2014
Posts: 32
|
|
Joined: Jun 2014
Posts: 32 |
Pipe will be the primary as it is shaping up now. However my watershed is quite enormous from 3 steep hills but not sure how to measure.
|
|
|
|
|
Joined: Sep 2009
Posts: 3,544 Likes: 1
Hall of Fame Lunker
|
|
Hall of Fame Lunker
Joined: Sep 2009
Posts: 3,544 Likes: 1 |
Check into anti-seep collar.. acme planimeter can help you find the acres shedding into your pond.. I'd get it figured out asap (like before you build the pond lol)..
I believe in catch and release. I catch then release to the grease.. BG. CSBG. LMB. HSB. RES.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|