So here's the facts more or less:

Current standby system operates at $10 per day 60 days on average for cost of $600

1/4 HP 115v Brookwood would run same time period for $40

1/2 HP 230v Brookwood would run same time period for $68

The 1/2 HP unit would give me an extra margin of error in capability and still get me the lion's share of the cost savings, but the operating cost is about 70% higher. Then again $28 more cost is peanuts compared to the $500+ savings.

This is assuming the $10 per day estimate is correct.