|
Forums36
Topics42,115
Posts571,701
Members19,116
| |
Most Online45,564 Yesterday at 03:05 AM
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
The clay should seal around it. What will you do if the runoff water is more than the sheetpiling can hold back? I'm assuming that they will use a pneumatic hammer to install it? As for cost, I haven't a clue. Dad and I installed something like that at the lake house in the late '70's. It's somewhere between 1/4" and 3/8" thick. We installed it using a garden hose and a piece of copper pipe. We washed it down, stopping about 6"-12" above where we wanted the level to be and used sledgehammers to pound it down. IIRC the pieces are about 6'-8' long. We capped it with 3"x3" or 4"x4" 3/16" or 1/4" thick angle. Stainless ladder. 
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|