Dave -- I only semi-leveled the area where I placed my container. I used two hydraulic floor jacks to lift the container off the ground once I got it in place. Mine has a lip near the bottom that allowed the floor jacks to easily lift it. I used different sized concrete blocks, and pressure treated lumber as shims, to get mine pretty darn level.