Well it has been longer than I thought it would be before getting back to work on my pond. With the wet winter and spring its just now drying out enough to get back to work. The first part of the pond filled with water last fall and has been full ever since. Since I only had 1/3 of it dug last fall I think the plan will be to leave it full and dig the other section of the pond and once fall gets here then I will dig the wall out that separates the two bodies. I will post more pics once I get further along.
Attachments
1.jpg 2.jpg 3.jpg 4.jpg 5.jpg 6.jpg 7.jpg 8.jpg 9.jpg 10.jpg