|
Forums36
Topics42,115
Posts571,707
Members19,116
| |
Most Online45,564 Yesterday at 03:05 AM
|
|
|
7 members (Theo Gallus, FireIsHot, Sunil, ewest, CentexSaj, Jim Thompson, WindowRock),
2,587
guests, and
402
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
We used 2" galvanized pipes for the uprights and used a copper 3/4" dia pipe and a hose on the inside of the pipes to jet them in. Water and sand/dirt came out of the top of the 2" pipes. We stopped about a foot to two feet shy of final desired height and pounded them down the rest of the way. Used a 2 hp, 2" outlet irrigation pump necked down to a 3/4" garden hose for a water supply and pumped right out of the lake to do it. We put the pier in the lake.
It's been in the lake for 35 years so far.......
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|