Hi Guys,

Well I think I got most of the permiting stuff out of the way but I want to make sure I'm doing this thing right. I've decided to go with 10" pvc pipe for my siphon which should give me 55% greater flow compared to the old 15" stand pipe. My biggest concern is my pipe length. Starting in the pond I'' have about 25ft of pipe going up the dam. 25ft across the dam and maybe 30ft down the back side of the dam to the stream. That means I've got 55ft of pipe before it hits the downward slope. Any issues with this? Does the long section in the middle matter? From what I've been reading it only matters that the pipe going down the back side of the dam is 4ft longer than the piece going down the front side right??