Glad I asked. I placed gravel in the bucket and it seemed stable. I wanted the height off the floor. Should I not worry about that?
I also attached a rope and a float so I can move it. I'd like to establish a schedule - run time and location - and get that going. I can automate the time, but will have do the moves the old fashion way.
Cecil,
Thanks for the pictures. I think I can handle somthing like that.
Barry