|
Forums36
Topics42,114
Posts571,687
Members19,115
| |
Most Online45,564 7 hours ago
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
There's nothing you can do about what they've dug out unless you want to dig up their den from above, fill with clay and smooth out the surface of the ground.
I've seen them start their dens deeper than 3' below the water line, but that's very rare. If your water level fluctuates, make sure that the rip rap will extend at least 3' below the lowest water level.
I've seen bank Beavers start their run in water that was 6' deep...............
If you can fill the pond to it's max to check for leaks, that would be best before placing the rip rap.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|