its 90-120/hour per machine here. lots of the guys here like to have a dozer pile the muck up and an excavator use the arm to deposit it on the back of the dam. Looking at close to $250/hr sick

Last edited by jakeb; 10/30/12 07:12 PM.

Get out and fish.