Making progress. Inside is always slow. At least now you can turn on the heat ( you did re-install the furnace right) and work all winter. Be sure to look out the window for encouragement and inspiration.
I am working on getting all the sheet metal required to make the final ductwork (feed and cold air return) connections. This, plus installation of the direct vent pipes thru the wall and the condensate pump. We do already have elec baseboard heat in the shop area that we are using for temp living space; it works terrific. Having the furnace hooked up, tho, will be very cool (err...warm?) because the entire place should be damned near insulated. It will be another milestone, of sorts.
Yep, I stand at the windows pretty often and refresh the vision.