Mentioned the other day (new member forum) about trying to get a permit, and seems to be impossible (mitigation credits are 4x's the property value). Trying to build a fish pond that also holds the water to flood a waterfowl impoundment. ACoE pretty much stopped the fish pond part, so I moved off line to the stream and have the ACoE coming out to tell me if the drainage area is under their jurisidction, it only has water in it after a rain, basically a drainage ditch. Anyway, my plan is to run apipe way upstream, 1000' and pick up enough higher elevation to pipe water over into the new layout. Roughly looks like about a 5-6' fall. Do some of you pond guys think it will work? (not sure if my attachments come thru, let m eknow if you can't see them and I will try again. Thanks.