|
Forums36
Topics42,113
Posts571,676
Members19,115
| |
Most Online13,561 22 hours ago
|
|
|
0 members (),
5,001
guests, and
226
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
We have a pier in a lake that was installed in the mid '70's. Never replaced a post yet, and it's close to 70' long. We used 2" galvanized pipe for posts, installing them by cutting holes in the ice, washing them in by screwing on a threaded cap, and hooking that end of the pipe to the garden hose. It washed itself down most of the way, and we pounded it the rest of the way with a sledge.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|