One of my ponds has been drained and work to clean out the muck is supposed to commence soon. Another is (I hope) as low as it is ever going to be, so I thought I would take this opportunity to set some posts for future docks.
If I use 4x4 or 6x6 CCA how long can I expect it to last?
The ponds are dry enough that I should be able to drive a tractor and post hole digger to the shore to set the posts a few feet in the ground. Should I pour some concrete around them, or will dirt be good enough?