Been awhile since I've updated here but there hasn't been a ton of progress so far. However, it appears we're at the point of critical mass and things may begin happening pretty quickly. No pictures tonight, but we have our concrete in place at this point and the bathroom is framed in. All of our rough cut lumber for the actual pavilion structure is now on site ready to be stained and the septic installer should be here next week. The electrical work (aside from the initial installation of the meter and an outside outlet) began on Monday and will resume tomorrow.
We've gotten a lot of thunderstorms recently and those have really thrown the workdays out of whack. I have had an unprecedented two weeks off this month and each week (this week included) while I had planned to work out there and try to get a lot done, the weather has had other ideas in mind for me. Lots of thinking on the fly as this has progressed but the overall plan is shaping up. I'll get some pics and post before too long.