|
Forums36
Topics42,115
Posts571,700
Members19,116
| |
Most Online45,564 03:05 AM
|
|
|
8 members (J. E. Craig, gehajake, FishinRod, WindowRock, jludwig, emactxag, Theo Gallus, LeighAnn),
3,304
guests, and
542
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
Menards has PT rated for underwater/in ground use, but it's special order.
We have a pier that has been in place since 1977 using 2" galvanized pipe for uprights, pounded into the lake bottom. It's never been taken out for the winter. The pier is on the SW side of the lake, and has seen ice 3' thick.
If you can figure out where the water level will be at full pool, and the water level will stay pretty constant, then I'd look into the metal pipe system.
If the water will fluctuate, then I'd look into a floating dock.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|