I think that I need the watershed, but I may divert later to the emergency spillway if things get bad. The pond is very long, so it will cost a bit to do. I plan to have a deep hole at the entrance to the pond which will hopefully catch most of the sediment as the water slows down. My other pond also catches some field runoff and it seems to do alright, but maybe SMB are a bad idea?