We have been rained out for the last week. There is another 5-6 feet of the dam to be built yet. Other than that, just shaping and removing 1000 yards of black dirt from pond basin, which the contractor is buying from me. Almost time to start adding structure and seeding the slopes. I have the side hills enrolled in CRP, and need to have everything reseeded by the 14th of May.