Thanks Ken I will give them a call.

The dam and excavation will be completed by Friday and the posts for the dock will be done Friday as well, I am going to the farm on Saturday to meet with the builder and use his heavy lifting equipment to place some structure and create a gravel bed. After that he will be doing some tests to ensure the dam is good to go and then the valve will be closed. The builder expects the pond to fill in 10 days, the creek that fills it runs pretty fast and has an 8 foot waterfall that flows hard even in dry weather. Adding fish in 14 days won't be a problem at all.