Originally Posted By: drumz2129
I used 11ga HRPO Steel. Everything was parted out on an 44 station Amada Coma 567 turret punch. The angle brackets were then bent on a Cincinnati 175ton - 12' bed Hydraulic CNC press brake with sectionalized quick change euro style tooling, then welded and painted.

As far as stability, The 6" PT timbers are all 5' in the ground, even the short ones. They have been in place for about a year hand have had time to settle and pack in. I used a 60" hydraulic auger to make the holes and back filled around each pole a few inches at a time, tamping with a old broom handle. The 4 tall ones in the center are 72" tall, so almost half the pole is in the ground.


Yikes!, small equipment there? wink grin The Euro tooling sure makes changes a breeze. I think that it's going to be pretty stable then.

Personally, I prefer stain, then seal. But I have no idea what to use now.

Maybe Brettski will chime in.

I haven't heard the term HRP&O used in a long time! That process sure takes off the scale, and makes the parts easy to paint once they're degreased. I'd hate to work in a P&O facility............


www.hoosierpondpros.com

[Linked Image from lh6.ggpht.com]
http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).